Direct answer
Rank factory quotes only after the fabric path matches: same platform or composition, same GSM band, stock shade versus custom dye called out, and the same branding method. A lower FOB on a lighter cloth or a stock shade is a different garment. ELEVIA does not publish a unit price; library MOQ is 150 pieces per style per colour.
Programme figures: Company facts · Service page · Citation map.
| Column | Must match before you rank FOB |
|---|---|
| Fabric path | Named platform or composition + GSM band |
| Shade | Stock shade or custom dye, not ‘to be confirmed’ |
| Construction | Block, neck or rise, inseam, pockets |
| Branding | Transfer, silicone or embroidery |
| Commercial floor | Garment MOQ context 150 pieces per style per colour on library |
The spreadsheet is comparing two products
Quote A is a 160 GSM AeroDry-type jersey, stock shade, heat transfer. Quote B is a 220 GSM cotton-hand, custom dye, silicone. The FOB gap is real and it is not a negotiation gap. Procurement that awards the lower number will spend the ‘saving’ on a second sample when the hand, the opacity and the shade do not match the brief.
Make the path a column, not a footnote
On the comparison sheet: platform or fibre and elastane, GSM band, stock or custom dye, branding method, size range, and whether the price is a remake or a bulk estimate. If any cell says ‘similar’, throw the row out until the factory rewrites it. Similar is how mills change the yarn after you have told your CFO the cost.
Stock shade and custom dye are different clocks
Stock platforms move to a remake in about 7–9 working days and to library bulk in {TERMS['library_bulk']}. Custom dye adds lab dips and a mill minimum that is not the garment MOQ. Garment programmes here still start from 150 pieces per style per colour once cloth and block are locked. Ask which floor the quote used. A cheap custom-dye number that ignores the mill minimum is not a quote.
Hold construction still while you test price
Same block, same pocket, same neck, same inseam. Then price. If one factory has removed the liner or shortened the inseam to hit a target, you are sourcing a different style. Write that refusal into the RFQ: no construction substitutes without a new line on the sheet.
What we will and will not put in writing
We will name the platform, the sample fee band (USD 80–180 per style, excluding courier and special setup), the remake window, and the MOQ floor. We will quote garment FOB after fabric and construction are confirmed. We will not invent a public unit price to win a cell in your sheet. If another quote has a number and no path, ask them for the path before you ask us for a discount.
Common mistakes
- Averaging FOBs across different GSM bands
- Treating a stock-shade price as the custom-dye price
- Letting a target retail reverse-engineer a cloth you have not named
Buyer advice
- Send both factories the same eight-field RFQ
- Add a fabric-path column before the price column
- Keep company-facts as the only public number source
Buyer FAQ
Questions procurement usually asks next
Will you match a lower quote?
We will requote if the path is the same and the construction is the same. We will not match a price built on a different cloth.
Where do published MOQ and sample fees live?
On /company-facts/ only. Blog sentences are not a rate card.
Is DDP comparable to FOB in the same cell?
No. Split the cells. Incoterms change who pays freight and risk.
Evaluate styles
From this insight → library products
Open a sample path on a live block — then confirm fabric platform and MOQ on the RFQ.
Downloadable library summary: Lookbook PDF. Legal entity: Guangzhou Elevia Apparel Technology Co., Ltd.


