Library sample
Evaluate this block as-is. Existing sample dispatch: 2–3 working days, subject to size and color availability. Otherwise remake: approximately 7–9 working days after confirmation.
Request this sample
1 / 8 · Click thumbnail or main image to switch
Relaxed men’s quarter-zip hoodie with contrast interior — structured hood and soft fleece hand for warm-up and cold-weather layers.
MOQ / color
Sample remake
Standard sizes
Shipping
Starting technical ranges for costing and sampling. Exact composition, GSM and measurements are locked at sampling against end use and target cost.
| Fit | Relaxed |
|---|---|
| Composition | Cotton / poly fleece blend |
| Weight (GSM) | 280–420 GSM |
| Stretch | Light stretch |
| Finish | Brushed / loopback fleece |
| Moisture | Insulating recovery layer |
| Recovery | Moderate |
| Size range | S–2XL |
| Extended sizes | 3XL–4XL available with additional grading |
What we typically engineer on this product type — confirm or revise on the tech pack.
Three clear paths — sample evaluation, light private-label customization, or fully custom.
Evaluate this block as-is. Existing sample dispatch: 2–3 working days, subject to size and color availability. Otherwise remake: approximately 7–9 working days after confirmation.
Request this sampleKeep the library pattern. Change color, branding, labels, packaging and light fit tweaks. MOQ from 150 pcs per style/color.
Request commercial quoteNew pattern, fabric or construction from tech pack / reference garment. PPS before bulk. MOQ based on fabric and construction.
Submit tech packWhat procurement teams need before opening a color run.
| Sample fee | Sample fee quoted per style; courier charged separately. Sample fee credit available on confirmed bulk when agreed in writing. |
|---|---|
| Sample lead time | Existing sample: 2–3 working days, subject to size and color availability. Remake: approximately 7–9 working days after confirmation. Status: Pattern ready. |
| MOQ | 150 pcs / colorway |
| Size mixing | Size curves may mix within a colorway at order confirmation. |
| Stock colors | Library shade options confirmed at sampling; custom shades via dye lot. |
| Custom dye MOQ | Typically aligns with style/color MOQ; specialty dyes may require higher booking — confirmed on quote. |
| Bulk lead time | 25–30 days after PPS approval |
| FOB / DDP | FOB Shenzhen / Guangzhou. DDP available. |
| Standard sizes | S–2XL |
| Extended sizes | 3XL–4XL available with additional grading |
SKU, fabric platform and sample size are passed into the enquiry. We reply within one working day.